Bolt2 min read
BOLT: Multi-Bottleneck Bound-Guided Learning for Flexible Job-Shop Scheduling with Time Lags and Resource-Coupled Transport
Flexible job-shop scheduling becomes resource-coupled when a scarce vehicle fleet moves jobs between stations, because the schedule sets the transport waits.
By Ziheng Zhang, Wei Zhang, Yunyi Zhao, Zuming Liu, Wei Zhou, Boon Ping GanarXiv cs.LG
Read the full story
Originally published by arXiv cs.LG on Oct 19, 2026.
Comments
Sign in to join the discussion.